Laserfiche WebLink
<br /> <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (5) <br />Subtotal (H): <br />'------- <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (5) <br />________I_~~~~~~__________________~_~~___________________~_I____________ <br />Subtotal (I ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />3 ~ Replace Topsoil <br />Cost (S) <br />5693 <br />Subtotal (J ): f693 <br />