My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126968
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126968
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:07 PM
Creation date
11/25/2007 4:06:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984108
IBM Index Class Name
Permit File
Doc Date
6/15/1984
Doc Name
LIMITED IMPACT 110 AND SPECIAL TEN-DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br />-4- <br />EXHIBIT F - Proof of Compliance with Local Government Zoning <br />In accordance with 3a-32-115(a)(e), the Board must make a finding that <br />will oe in compliance with local zoning or suodivision regulations. Yoe <br />required to submit this information, but a submission would assist the i <br />processing of the application. When the Uivision notifies the local go <br />existence of this application, it will request information regarding cor <br />applicable local law. It is intended that operators .nay concurrently c~ <br />compliance with local requirements at the same time the Uivision is proc <br />application. Information regarding the status with local government wi <br />EXHIBIT G - Source of Legal Right-to-Enter <br />ie operation <br />are not <br />ivision's <br />trninent of the <br />~liance with <br />ie i nto <br />~ssing this <br />I de Helpful. <br />This could oe a copy of the lease, deed, abstract of title, or current tax receipt. Nn <br />acceptaole alternative would oe a statement acknowledged by a Notary Pub is that the <br />operator has the legal right to enter the mine. <br />EXHIBIT H - Reclamation Costs <br />For a 11U perrait, if the operator requests financial warranty to be less than $5,000.00, <br />the operator must submit facts to support such a request. Otherwise, a financial <br />warranty of $S,000.UO will automatically oe sat. For all 111 permits, t e financial <br />warranty shall be $2,SU0.00 per acre. <br />EXHIBIT I - Terms of Governmental Contracts (111 Aoolications onl <br />For Special 10-Uay (111) permits, the operator must submit a copy of the contract or <br />other proof that proves the necessity of a Special 10-day permit. The o erator must <br />also suo~nit evidence of the financial warranty provided under the govern ental contract, <br />if it was required. <br />NOTICE PROCEDURES <br />After the application is considered "filed" (pursuant to Rule 1.1(10) wi h the Mined <br />Land Reclamation Uivision, notice procedures outlined in rule 3.2 and/or 4.2 must be <br />followed. (Format for such notices will oe included in the letter you r ceive from the <br />MLR staff informing you of the Completeness ("filing") of your applicati n.) <br />FINANCIHL IJARRAIJTY <br />Prior to permit issuance, proper performance and financial warranty must be received in <br />accordance with Rule 7. Please obtain the appropriate form for your cho en method of <br />financial warranty. <br />
The URL can be used to link to this page
Your browser does not support the video tag.