Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name DMG <br /> <br />Task # : 011 Slate : Coloratlo PermiOjob# : M•1977.02J <br />Dale : 02A6/2001 County :Gunnison Ahbreviation :none <br />User : RCO Site :Ready Mix Pit Filename : M023-017 <br /> <br />Permd or other job action : Bored review <br /> <br />Task description :Spread topsoil on pond banks, down ro high water line <br /> <br />HOURLY EQUIPMENT COST Basm machine: Car DBN (1996) Horsepower: 285 <br /> Blade type . Semi-Universal <br /> Attachment no. 1 ' ROPS Gab Shift basis : 1 per day <br />Attachment no. 2 .3-shank npcer <br />Cost Breakdown : Ownership test/hour <br />Operaling cosOhour <br />Ripper op. costlhour <br />Operator cosOhour <br />Total unit coslfheur <br />Utilization % Cosl data source : (CRG) <br />E44.00 NA <br />E64.40 100 <br />$0.00 0 <br />E27.99 NA <br />E136.38 Total heel cost/heur : $136.38 <br />MATERIAL QUANTITIES <br />Initial Svrell <br />volume: 7,325 LCY lector: NA <br />Source of quantity take-oll :124/01 /nsp, see Task 009 <br />Source of est. swell factor : NA <br />HOURLY PRODUCTION <br />Job Condilioi <br />Average push distance: 50 leel <br />Unadjusted hourly production : 1180 LCY/hr <br />Material consistency description <br />Loose sracko/le <br />Average push gradient : 10.00 :6 (negJ <br />Average sire alhtutle : 7, 700 leel <br />Material weight : 2,100 Ibs/LCY <br />Material weight description' <br />Eanh-Loam <br />Operator skill <br />Material consistenry <br />Dozing method <br />Visibility <br />Job efhcienty <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted Oeet production <br />0.75 <br />Source <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />1.43 <br />1.00 <br />1.10 <br />1.00 <br />963.07 <br />963.07 <br />LCY/hr <br />LCV/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job lime : 7.61 Hours <br />Unit cost : E0.142 /LCY Total lob cost : $1,037 <br />Loose <br />volume: 7,325 LCY <br />