My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126919
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:04 PM
Creation date
11/25/2007 4:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977023
IBM Index Class Name
Permit File
Doc Date
2/9/2001
Doc Name
READY MIX PN M-1977-023 RECLAMATION COST RECALCULATION BOND INCREASE NOTICE
From
DMG
To
VALCO GUNNISON CONCRETE DIVISION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name DMG <br />Task # : 010 Stale :Colorado PermiUjoh # : M-1977-023 <br />Date : 02/068001 County :Gunnison Abbreviation :none <br />User . RCO Sile : Reatly Mix Pit Filename : M023-010 <br />Permit or other job action :Bond review <br />Task description :Rip compaction in N pad area, for seed bed prep <br />HOURLY EQUIPMENT COST Basic machine : Cat OBN (1996) Horsepower : 285 <br />Blade type : Semi-Universal <br />Allachmenl no. 1 : ROPS Cab ShiO basis : 1 per tlay <br />Allachmenl no. 2 : 3-shank upper <br /> Utilization % Cost data source (CRGJ <br />Cast Breakdown : Ownership cosUhour : E44 00 NA <br />Operating cosVhour: E64.40 100 <br />Ripper op cosUhour: E7.60 700 <br />Operator cosVhour: E27.99 NA <br />Total unit cosUhour : E743.88 Total Beet cosUhr : $143.88 <br />MATERIAL QUANTITIES <br />Seismic <br />method : NA <br />Area <br />method : 17.87 Acres Rip depth (It): 1.00 <br />Source of quantity take-olf . 18G91 insp. <br />Source of material load factor : NA <br />HOURLY PRODUCTION <br />volume : 28,830 BCY or CCY <br />Seismic method : Material seismic velocity : NA leel per second <br /> Unadjusted hourly production : NA BCY or CCY/hr <br />lvea method : Average ripping depth per pass . 7.00 feet <br /> Average ripping wtdlh per pass : 7.08 leel <br /> Average ripping length per pass : 500.00 leel <br /> Average velocity of machine : 88.00 feel per minute <br /> Average machine maneuver time /pass : 0.25 minutes <br /> Hourly production per unit area : 0.822 acres per hour <br /> Unadjusted hourly production : 1,326.18 BCY or CCY/hr <br />Correction lectors : Unadjusted hourly production : 1,326.78 BCY or CCVlhr <br /> Site altitude: 7,700 feet <br /> Altitude adjustment' 700 (Car HB/ <br /> Job elhciency factor : 0.83 (1 shiNtlayJ <br /> ~Nellob correction: 0.83 multiplier <br /> Adjusted hourly unit production : 1,100.73 BCY or CCY/hr <br /> Adjusted hourly fleet production : 1,100. ]3 BCY or CCY/hr <br />JOB TIME AND COST <br />Fleet size : f Dozers) Total job time : 28,19 Hours <br />Unit cost . 50.13/ ILCV Tofal joh cost . $3,)69 <br />Selected estimating method : Area <br />NA Load factor : NA Bank volume : NA BCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.