volume and total quantities hauled to the Project Manager not later than 12:00 noon on the following <br />~~Y <br />Proposal Description and Quantities <br />Phase I - Betasso Water Treatment Platt opsoil <br />~. <br />1. Hauling of Topsoil ~ Approximately 1500 c.y. <br />Work anticipated- Loading, hauling, and d-iipping of topsoil materials from the B'~etasso Water <br />Treatment Plant facility to the Varra Gravel Pit. <br />Phase II - 63rd Street Water Treatment Plant Topsoil <br />1. Hauling of Topsoil Approximately 5000 c.y. <br />Work anticipated- Loading, hauling, and dumping of topsoil materials from the 63rd Street Water <br />Treatment Plain facility to the Varra Gravel Pit. <br />Prepared by Glenn Gamete, P.E., Project Manager <br />End of Proposal. <br />