Laserfiche WebLink
<br />G. As-built drawings of the structures will be submitted verifying there construction when and if <br />they are constructed. <br />I discussed with Patty Schrader Gelatt of the USFWS what would happen if mining was <br />terminated before the location of the inlet strtuture was reached She indicated that construction <br />of the outlet structure only might be a possibility. However, USFWS would like to coasult with <br />us to determine what other alternatives might be available depending on where mining is <br />stopped. Construction of a long inlet channel would probably not be a good alternative. <br />If only the outlet structwe is constructed , it is proposed to be constructed using the <br />configttration of the present inlet structure. Engineering design will be approved by the Division <br />prior to construction. Riprap will be d50(24") per CDOT specifications. <br />Phases V, VI and VII will not be mined until engineering design and bonding for the structures <br />is approved by the Division. <br />8. Enclosed is a letter dated Mazch 26; 1999 from the CDOW to the Mesa County Planning which <br />indicated their knowledge of the bald eagle winter roost azea on the island. <br />Enclosed is a receipt from the Mesa County Clerk and Recorded for placing this material on file. <br />Sin~ce,,rely,~/~/ <br />~'-~-"C <br />Edward J. Settle <br />