Laserfiche WebLink
State Highway Access Permit Page 5 <br />Attachment to Permit No. 103039 -Additional Terms and Conditions <br />Drainage to the State Highway right-of--way shall not exceed the historical rate of flow. <br />Discharges to the CDOT highway drainage system from facilities authorized for construction through this <br />Access Permit are only allowed under the following conditions: <br />1) The discharge is authorized by a Colorado Dischazge Permit System (CDPS) permit issued by the Colorado <br />Deparhnent of Public Health and Environment (CDPHE); or, <br />2) The discharge is an "allowable non-stormwater discharge' ; or, <br />3) The discharge has been specifically exempted from CDPS permitting by the CDPHE through a letter of <br />permission or other type of written approval. <br />Prohibited discharges include substances such as paint, automotive fluids, solvents, oils or soaps. <br />41. The Pernuttee shall install a new 18-inch corrugated culvert with flared end sections. <br />42. Minimum cover for buried utilities shall be 48 inches. <br />