Laserfiche WebLink
.~.:: f;s <br />Mr. David Goss - 2 - <br />November 18, 1985 <br />1.D. The pipe installed beneath the road requires an energy dissipater at the <br />~out~let to minimize erosion if flow does occur.~~ <br />L~ 4/5. Will farm topsoil be utilized for revegetation? If so, please include <br />the disturbance in the affected land acreage. If not, please specify what <br />Q / material will be utilized as plant growth medium. <br />`~ Exhibit H -Reclamation costs <br />1. Did you choose the 65,000.00 maximum Financial Warranty assessed a Limited <br />Impact operation? <br />If a Regular Operation Permit is applied for, reclamation cost estimate <br />calculations are required. <br />If you have any questions, please do not hesitate to contact me. <br />Sincerely, <br />Criu~~ ~I ~iLttGC~ <br />Camille M. Farrell <br />Reclamation Specialist <br />CMF/bdc <br />Enclosure(s) <br />5006E <br />