Laserfiche WebLink
• <br /> <br />To: <br />ENERGY FUELS <br />BOX G <br />GTLITHOMPSON, INC. <br />CONSULTING GEOTECHNICAL <br />Ah'D MATERIALS ENGINEERS <br />STEAt180AT SPRINGS, COLORACO 80477 <br />6004 <br />Jab No. <br />Date I2isi79 <br />Subject: Fill Control at <br />ENERGY FUELS, STEAMBOAT SPRINGS <br />SEDIMENTATION POND 'C' <br />Daily Report Nn I <br />EST <br />N0. <br />LOCATION DEPTH TEST <br />TYPE SPEC.MAX. <br />DENSITY <br />P. C. F. OMC <br />~~~ ORY <br />DENSITY <br />P. C. F MOISTURE <br />CONTENT <br />'ti COMPACTION <br />SOIL TYPE <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Type of compaction equipment and numberof units: 1-SHEEPSFOOT ROLLER <br />Number of posses: VARIED <br />Thickness of lift 6 inches. <br />• Method of adding moisture: NATURAL <br />Type of earth moving equipment and number of units: 2-SELF-LOADING SCRAPERS <br />Prag re55 Report: STRIPPING IVAS IN PROGRESS IN EMBANKMENT AND c^DRR01•J AREAS TD R=MOVE FROZEN <br /> <br />MATERIAL AND VEGETATION. CONSIDEfiA9LE DIFFICLLTY L'!AS ENCOUNTERED IN REM1iOVAL OF MUCK FROP'. <br />OLD DRAINAGE DITCH IVHICH PASSES THROWH THE EMBANKMENT AREA; EQUIPMENT KEPT GETTING STUCK. <br />A SI•tALL A.''OUNT OF FILL WAS PLACED ON DOl•JNSTREAM TOE, NOT ENOUGH TO REQUIRE TESTING. A <br />STMDARD PROCTOR DENSITY TEST IVAS PERFORMED. TEMPERATURE 6VAS 25° TO 30°F, VERY LVIN'DY AND <br />LIGHT SNO':J. <br /> .,%' ~1.. <br />_,~ ` <br /> l'lILLIAPi KOEPC~' <br />,110r~T <br />. <br />~~" <br /> <br />~ ~ <br />_ <br />~ <br />_ <br />a . Fin d rpmeer "y 1 <br /> . <br />~~ <br />~+ r. <br />/Y '~ ~ y <br />i <br /> APProved nJr/~,~ .~ ~/• <br />, <br />flN~y:NG WILLIAM 1~ ~Q TTF~„P:E. ~ <br />l <br />SAL '~ • <br /> ,~ <br />J <br />" <br />' <br />~ <br /> r <br />• <br />~ Cp,",rt~ <br />YIIS" <br />'. <br /> ~ <br />~• <br />