My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126527
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:44 PM
Creation date
11/25/2007 3:35:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Permit File
Doc Name
MLRD MINUTES 1/25-26/78
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ iii iiiiiiiiiiiu iii <br />?JLRB ?IINUTES 999 <br />1/25-26/78 ~//~l~ ~ J ~ ~~ <br /> <br />?LOVED that Pf.N be permitted to revise timetable of operations <br />and location of certain phases as outlined on Exhib:;t B <br />(File IF74-31C/a). <br />Seconded and <br />PASSED. <br />-8- <br />The Board did not approve P&M request to locate coal stockpile area <br />and haul road ~~hich would be used in connection with future underground <br />mine operation. A finding of fact was made that it is inappropriate for <br />the MLRB to approve surface facilities on unpermitted operations. <br />52. Reclamation Specialist Maggie Koperski read letter into the record <br />from David Sturges of Peabody Coal Co. regarding companies' authorization <br />to bind that company contractually. <br />MOVED to put the question of authorization to bind compan.• <br />contractually on the agenda/Notice of Rule making foc' <br />the March 2, 1978 rulemaking session of this Board. <br />Seconded and <br />PASSED. <br /> <br />12. Standard ?fetals Co. 1177-378 140 acres, San Juan Count}•, silver mine. <br />Silverton, CO <br />Application presented by Reclamation Specialist Rade Orell, with staff <br />recommending approval of application and bonding of $347,543. Bond <br />coverage of mill facilities is pending until such time as the R,Ttorney <br />General's office formulates an agreement regarding 'same. Permit not to <br />be issued until such agreement is finalized between Standard Metals Co. <br />and the ?ILRB, its staff and attorneys. tor. Orell also read into the <br />record a letter from the Department of Health, which in essence stated <br />that "a serious iaater quality problem exists due to untreated mine crater <br />coming from the American Tunnel draining the Sunnyside Mine caater to <br />Cement Creek, a tributary to the Animas River...". Discussion ensued on <br />the groundwater issue, with Board agreeing on language of a n!ot.ion addressing <br />same, to be added as condition to the permit. <br />?[OVED to grant permit to Standard Metals Co. 1177-375 for 140 acre silver <br />operation in San Juan County. Bond set at $347,543; coltich figure <br />includes the State's 10% administrative costs. Bon d coverage <br />of mill facilities is pending until such time as the Attorney <br />General's office and the operator shall meet to devise an equitable <br />manner in which the dismantling/removal of surface mill facilities <br />can be achieved. The AG will report back to the AB.F.B in onr month, <br />at the nest regularly scheduled meeting. Permit eri]_l be issued on <br />resolution of bonding problem, and the addition of the follui:ing <br />two conditions: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.