My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126519
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:43 PM
Creation date
11/25/2007 3:34:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001001
IBM Index Class Name
Permit File
Doc Date
3/21/2001
Doc Name
CONSTRUCTION MATERIALS REGULAR 112 OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />+~ <br />Ci <br />0 <br />N <br />Q <br />• Exhibit Page 10 <br />0 <br />p ~ STRIPPING: The initial year's mining area of 6.0 acres will be stripped to an estimated <br />ro depth of 2 feet and the topsoil stored in Stockpiles S3 and S4 (without screening, but <br />tL ~ would probably be screened later in the mining sequence before being used for <br />$,~ reclamation). This would create a noise and visual barrier to the south, which is the <br />~ o direction of the nearest houses (more than 500 feet distant). The stripping will be done <br />~ s on a yearly basis for the first three years. The stripped area will drain, with suitable <br />erosion and sediment control in accordance with the Surface Water Management Plan <br />~ (SWMP), to an existing pipe which discharges to the Dolores River. <br />INITIAL FACE WORK: <br />Mining will begin by the excavation of a ramp, from the stripped surface to a depth of <br />approximately 6-10 feet (for a total length of 250 feet to approximately elevation 7208, in <br />the eastern half of the area (Area 1A) for mining during Year 1 (southeast corner of the <br />permit area). This level is chosen to allow continued gravity drainage of any water <br />collecting in the pit, through the existing pipe, in accordance with the SWMP, and to <br />prevent or reduce loss of ground water to evaporation from ponds. Mining may be done <br />in several lifts to reduce face height, and allow for better drainage, but will be less than <br />10 feet. <br />During this period, the processing plant will be located on the western side of Year 1's <br />mining area (Area A2), which has been stripped but not mined. Stockpiles of processed <br />material will be located to create as much a noise barrier as possible to the south of the <br />processing plant. Excess material from screening and washing will be placed in <br />Stockpile S5, which will screen operations from the highway, extending north from <br />Stockpile S3. <br />The initial face will be expanded to include the entire southeast corner of the permit <br />area, ranging from 3.5 to 10.0 feet deep (5.5 to 12.0 below original ground level), with <br />the floor of the pit sloped at a 0.5% grade for drainage. <br />EXPANSION OF INITIAL FACE AND FIRST YEAR MINING <br />Once the upper level of the Area 1A is mined, the processing plant.will be relocated to <br />that area, and Area 1 B, (the western portion of Year 1, southwest corner of the site) will <br />also have the upper level mined. A sediment basin will be excavated in the southeast <br />corner of the site (south of the relocated plant), approximately 250 by 150 feet and up to <br />20 feet deep, to improve drainage of subsurface water and reduce sediment, as well as <br />collect material from washing of sand and gravel. This area will likely remain in open <br />water from this period on, and forms the basis of the permanent ponds on the site. <br />During Year 1, Stockpiles S1 through S5 will be built. <br />MINING OF THE UPPER LEVEL <br />In Year 2, mining of the central portion of the upper level will be done, stripping and <br />mining an area of 6.6 acres. After stripping 2 feet of soil, raw material will be removed <br />at a depth of from 5.5 to 10.0 feet (7.5 to 12.0 feet below original ground level). The <br />processing plant will be set up in the same location as in the beginning of Year 1, near <br />berms to reduce noise to the south. A drainage ditch of up to 50 by 600 feet and up to <br />15 feet deep will be excavated (connecting to the sediment basin) to improve drainage <br />and transport sediment to the basin. During Year 2, Stockpiles S6 and S7 will be built. <br />In Year 3, mining of the north end of the upper level will be done, stripping and mining <br />an area of 1.67 acres. After stripping 2 feet of soil, raw material will be removed at a <br />depth of from 6.9 to 8.4 feet (8.9 to 10.4 feet below original ground level). The <br />Four States Aggregates, LLC 15 MAR 2001 <br />Application for Permit: Line Camp Pit M-2001-001 FSA-LCP-D2-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.