Laserfiche WebLink
Exhibit Page 9 ~ MAR 21 ?~~l <br />Diviy~~ orMo F'e~d py~cB <br />supporting activities. The area actually mined will vary from year to year, depending on tfa~SBGaoi <br />level worked. Mining will begin in the southeast corner, moving generally north while first °9Y <br />mining an upper level, and then mining the lower level (which will probably require dewatering), <br />also generally from south to north. Various areas, primarily on the edge of the permit area, will <br />be used for stockpiles of overburden and topsoil. Near the end of the life of the permit, various <br />stockpile areas may be used which will be converted to reclamation features at the end of <br />mining (see reclamation plan). <br />PREVIOUS SITE DEVELOPMENT: <br />This site is irrigated cropland, watered by the Home Ditch (Dolores Priority #3), though in recent <br />years has been used as irrigated pastureland. There is no visible evidence of past mining or <br />other activities on the site, other than agricultural use, although there is historical <br />documentation of a railroad line up the valley at this point, which apparently used the current <br />road bed of CO Highway 145 or an area immediately adjacent to it. <br />The permit boundary has been laid out to avoid virtually all wooded areas, and to avoid the river <br />bank and areas with wetlands or other sensitive areas along the river, thus creating <br />conservation buffers for these areas. <br />TABLE D-1. SUMMARY OF AFFECTED LANDS FOR LIFE OF MINE <br />Activity Period Impacted Maximum <br />Acres Remarks <br />Line Camp Access Road <br />and Pi eline Entire life of pit; to remain <br />ermanentl 1.6 See Exhibit S, replacing existing <br />access road and drains a ditches <br />Access Road Entire life of pit, but <br />steadily decreasing 1.1 Access from Line Camp Access <br />Road into pit, improving farm <br />access <br />Year 1 minin Year 1 to 5 8.1 U er level <br />Year 2 minin Year 2 to 5 7.6 U er level <br />Year 3 minin u er Year 3 to 5 2.2 North end of site <br />Year 3 minin lower Year 1 to 5 Incl: 5.7 East side of site, alread mined <br />Year 4 minin Year 1 to 5 Incl: 5.3 Lower level, alread mined <br />Year 5 minin Year 1 to 5 Incl: 5.3 Lower level, alread mined <br />Stock files Entire life of it Incl: 4.9 Around erimeter of ermit <br />Total 20.5 Not including overlap, since areas <br />are worked separately on two <br />levels <br />INITIAL SITE DEVELOPMENT: <br />ACCESS: The pit will be opened by using the Line Camp access road from Highway <br />145 to the north of the pit, improving the existing farm field access into the northern <br />portion of the pit into a 960-foot haul road, stripping topsoil from 1.1 acres and storing <br />material (without screening) in the Stockpiles S1 and S2. This roadway will be used for <br />the life of the mine (but will be shortened as mining proceeds) and will be replaced by a <br />1740 foot road (see Reclamation Plan) after mining by the landowner for access to the <br />ponds and south field. <br />Four States Aggregates, LLC 15 MAR 2001 <br />Application for Permit: Line Camp Pit M-2001-001 FSA-LCP-D2-001 <br />