Laserfiche WebLink
<br />SCHEDULE 2 <br />CLASS II <br />RATING OF PRODUCTION CASING FLANGE IS LESS THAN OR EQUAL TO 21,000kPa <br />HpS CONTENT OF THE GAS IS LESS THAN 10 moles/kilomole <br />To Pump or Tank <br />Full Opening <br />Ram Type <br />Preventerc <br />Wellhea~ <br />BLOWOUT PREVENTION STACK <br />Tubing Connection <br />F <br />1 <br />MANIFOLD SYSTEM <br />NOTE: <br />1. Pressure mting of preventers is equal to or greater than the production easing flange <br />rating, or the formation pressure, whichever is the lesser. <br />2. 50 mm lines throughout. <br />3. The positioning of the tubing and blind rams may be interchanged. <br />4. Spool may have threaded side outlet (and valve) if wellhead has threaded fittings. <br />5. A flanged blowout prcventer port (and valve) below the lowest set of Toms may replace spool <br />(valve may be threaded if wellhead has threaded fittings). <br />r <br />ACCUMULATOR SYSTEM <br />Spool or Blowout nig <br />Preventer Connection Pump <br />