Laserfiche WebLink
• SCHEDULE 2 <br />CLASS I <br />RESERVOIR PRESSURE LESS THAN 5500 kPa AND NO HZS PRESENT <br />MINIMUM PRESSURE RATING 14,000kPa <br />c.,... <br />~ull Opening Safety Volve <br />Tubing <br />Annula <br />or <br />Rom T <br />Preven <br />To Flare <br />To Flare <br />Shut-Off Device <br />OIL WELL <br />BLOWOUT PREVENTION STACK <br />NOTE: <br />1. Well is not lulled. <br />2. A tubing and blind ram blowout preventer unit may be used In lieu of an annular <br />preventer (position of rams may be interchanged). <br />3. The Tubing stripper may be located below the blowout preventer(s) provided it <br />is on integral port of the wellhead. <br />4. Two Flare Lines -minimum diameter 50 mm, or <br />One Flare Line -minimum diameter 75 mm, extending 50 m from well. <br />Page 1 <br /> <br />ACCUMULATOR SYSTEM <br />