Laserfiche WebLink
Pf;.BUP TBUCH C09T DATA YOBH9H66T cont'd <br />....................................... <br />OPB@AtOB NACBS <br />Labor Classification Zooe Designation <br />Truct Operator Zone A <br />Zone B <br />Fore~nn Zone 1 <br />Zone 2 <br />Mechanic Zone 1 <br />Zone 2 <br />Sheet 2 of 2 sheets <br /> Fringe F,I.C.A Une~pl, Yh.Coap. ; <br />Base @ate Benefits 10.07151 (0.091 (0.041 total ; <br />!11.60 !3.49 10.83 !1,04 !0,46 !17.43 ; <br />l11,8S !3,49 f0.8S !1,07 f0,4T !11.73 ; <br />!15.20 !3.38 !1,09 !1,37 !0,61 !21.64 <br />f1S,87 !3.38 f1.13 (1.43 !0.63 !22,45 <br />f14.4S 13,38 (1.03 !1.30 !0,58 !20.74 ; <br />l14.4S 13,38 !1.03 !1.30 !0,58 !20,74 ; <br />ACQUISITION C09T: <br />Base purchase price (CBCC f1S,938,00 <br />Lees dealer diecaunt (CHCC 8 1Sg1 !2,390.70 <br />Plus freight (CBCC 9 N/AI f0.00 <br />Plus dealer charges (aeeuae .32;1 !47,81 <br />.............. <br />Adjusted purchase price f13,S9S,11 <br />Plus tares: State sales B 31 5407,85 <br /> 9MN 8 2Y !271.90 <br />Leas fire coat (CBCCI (398,45 <br />Lees ealrage value (CBCC B iS.3gl 52,080.05 <br />NBt ACQUISITION COST (11,796,37 <br />ihift Differential (!/hr1 <br />Day shift: !0.00 <br />axing shift: !0.20 <br />Graveyard shift: (0.40 <br />2 shift/day avg, !0,10 <br />3 ehiftlday avg. 10,20 <br />C09t 9UMMA8P <br />Oxnerehip Coet/Br: <br />Operating-Overhaul Cost/Hr: <br />Forevan CostlBr; <br />TOTAL C09t/@@ <br />3INCL6 9BIFt DOUBLE 9BIF1 <br />BA8I8 BA918 <br />Zone 1 Zone 2 Zone 1 Zooe 2 <br />f2.Ol 12,01 11,34 11,34 <br />!0,44 !0,44 !0.44 (0.44 <br />!21.64 !22,45 521,74 f22.5S <br />!24,09 (24.89 !23,52 (24.33 <br />T@IPLB SBI T <br />BASIB <br />Zose 1 Zon 2 <br />11,12 11.12 <br />!0.44 f6 44 <br />!21.64 f22,65 <br />!23,40 f24,I20 <br />