Laserfiche WebLink
(fl <br />(i) Final grading of the mining area will be completed such that <br />no reclaimed slope will exceed 3:1. It is anticipated that <br />pre-mining slopes in excess of 3:1 wherein no mining occurs <br />will remain at their natural gradient. <br />(ii) Seeding (see above) <br />(iii) It is not anticipated that fertilization will be required in light of <br />the post-use residential development. <br />(iv) Revegetation (see above) <br />(v) Topsoiling within phases A, B, C will be replaced at depths <br />ranging from 4 - 8" or as dictated by the amount present <br />during pre-mining removal. The slope banks of Phase D will <br />receive approximately 6" of topsoil. It is not expected that <br />adequate topsoil for replacement exists in Phase E. <br />