My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126037
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:19 PM
Creation date
11/25/2007 2:48:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005045
IBM Index Class Name
Permit File
Doc Date
6/15/2005
Doc Name
construction materials
From
gravel llc
To
dmg
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phases A, B and C - In consultation with area grass experts, <br />these phases will be seeded with an irrigated seed mix containing <br />appropriate percentages of the following: <br />Orchard Grass <br />Perennial Rye <br />Tall Fescue <br />Smooth Brome <br />Annual Rye <br />The recommended rate of seeding for the above is 20 - 25 lbs./ <br />acre utilizing the drilled placement method. <br />Phase D is anticipated to reclaimed as a reservoir with 3:1 slope <br />banks. These banks will be seeded with the seed mix and method <br />described above. <br />Phase E will be seeded with Crested Wheat Grass at a <br />recommended rate of 12 lbs./acre utilizing the drilled placement <br />method. <br />The seed types listed above are currently available locally in sufficient <br />quantities to meet the proposed reclamation. Seeding will be done at <br />appropriate seasonal periods as recommended by area experts. <br />(e) Reclamation Implementation Schedule: <br />(i) It is estimated that reclamation for each ten-acre section within <br />Phases A, B, C and E will require a period of six to nine months <br />following the cessation of mining. This is based on two to three <br />months of overburden and topsoil replacement earthwork and <br />allowance for seasonal seed placement opportunities. <br />Reclamation of Phase D will likely be completed in three to six <br />months following mining dependent upon seasonal seeding <br />windows. <br />(ii) As mentioned above, reclamation will progress in sections not to <br />exceed ten acres within any given phase of operation. <br />(iii) The proposed sequence of reclamation stages is consistent <br />throughout Phases A, B, C, D, and E. <br />1. Replacement of overburden -rough grading <br />2. Replacement of topsoil (where applicable) <br />3. Fnal grading <br />4. Seeding <br />
The URL can be used to link to this page
Your browser does not support the video tag.