Laserfiche WebLink
<br /> <br />71. LOADINd INTO FINIBBBD PRODQCT BTOCICPILB <br />Method of loading in (front-end loader, conveyor, etc.) <br />If conveyor is used, what is maximum drop height? ~2 ft. <br />Loading schedule: tons/hour hours/day „3p__ days/year <br />Proposed controls Reduce drop height and water if warrented <br />Controls for loading to stockpile include other (speaily), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />8. FINIBH$D PRODIICT 8TOCICPILB <br />Maximum tons stored at one time 30000 tons. <br />Length of time pile remains undisturbed up to 1 yr. <br />Proposed controls: (oheck appropriate bozos) <br />^ Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />^ Chemical stabilizer (applied according to manufacturer's <br />specifications). <br />^ Compacting of piles, method <br />^ Enclosures: complete, or partial (check oae) <br />^ Revegetation, (length of time till revegetation ) <br />^ Other (specilp) <br />® No control <br />C. LOADINd ODT FROM BTOCICPILB FOR FINAL TRANSPORT <br />Method of loading out (front-end loader, conveyor, etc.) <br />front-end load <br />If conveyor is used, what <br />Loading schedule: <br />Proposed controls <br />drop height? NN ft. <br />10 hours/day 60 days/year <br />Controls for loading out of stockpile include Water injection, <br />chemical dust suppressants, bag collectors, other (speoify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppresants, <br />reduced drop height, telescoping chute. <br />7 <br />