My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125920
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:14 PM
Creation date
11/25/2007 2:37:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995046
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT M LAND DEVELOPMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />71. LOADINd INTO FINIBBBD PRODQCT BTOCICPILB <br />Method of loading in (front-end loader, conveyor, etc.) <br />If conveyor is used, what is maximum drop height? ~2 ft. <br />Loading schedule: tons/hour hours/day „3p__ days/year <br />Proposed controls Reduce drop height and water if warrented <br />Controls for loading to stockpile include other (speaily), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />8. FINIBH$D PRODIICT 8TOCICPILB <br />Maximum tons stored at one time 30000 tons. <br />Length of time pile remains undisturbed up to 1 yr. <br />Proposed controls: (oheck appropriate bozos) <br />^ Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />^ Chemical stabilizer (applied according to manufacturer's <br />specifications). <br />^ Compacting of piles, method <br />^ Enclosures: complete, or partial (check oae) <br />^ Revegetation, (length of time till revegetation ) <br />^ Other (specilp) <br />® No control <br />C. LOADINd ODT FROM BTOCICPILB FOR FINAL TRANSPORT <br />Method of loading out (front-end loader, conveyor, etc.) <br />front-end load <br />If conveyor is used, what <br />Loading schedule: <br />Proposed controls <br />drop height? NN ft. <br />10 hours/day 60 days/year <br />Controls for loading out of stockpile include Water injection, <br />chemical dust suppressants, bag collectors, other (speoify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppresants, <br />reduced drop height, telescoping chute. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.