Laserfiche WebLink
<br />IX. VSHZCLB HAQL ROADB <br />CONTROL OPTIONS FOR VESICLE BAIIL ROADB <br />_ (DO NOT RRITE IN T828 SECTION) <br />i. Watering (speoily) times/day, to maintain moist surface. <br />2. Chemical stabilization <br />(according to manufacturer's specifications) <br />specify: <br />a. Frequency of application and <br />b. Type of stabilizer (brand name, or composition) <br />3. Paving to be completed by <br />4. Gravel <br />(date). <br />(LIST HAIIL ROAD CONTROLS IN THS APPROPRIATS SPACES BSLOIf) <br />A. TRANSPORT O! RAI- !lATSRZAL !ROlL RE?lOVAL SITE TO STOCKPILE <br />Distance (one rap) tnn~ <br />If stockpile is off site, give distance from removal site to mine <br />entrance <br />Haul vehicle capacity Nu No. of wheels <br />Average vehicle speed m.p.h. <br />Maximum vehicle speed m.p.h. (cannot exceed 30 m.p.h) <br />No. of tripe per day <br />Haul road silt content (if knora) ;. <br />List controls for raw materials transport: (see aaasures listed above) <br />Proposed controls Kn <br />8 <br />