My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125894
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:13 PM
Creation date
11/25/2007 2:34:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/25/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />Run-off from the loadout disturbance is generally contained in two sediment <br />ponds which contain the run-off from the batch weigh loadout and most of the <br />disturbance to the east. Run-off from a transfer tower the disturbance <br />associated with a conveyor support and the disturbed area along the western <br />loadout track will not be contained in sediment ponds. There are eleven <br />SAE areas where run-off will be filtered through a sediment fence before it <br />leaves the permit area. Sample points for the SAEs will be located near the <br />sediment fences. The design for the alternative sediment control devices are <br />presented in Exhibit 8 pages Exh8- 187 through 189 and the locations are <br />shown on Map 20. <br />During 2002, fourteen exploration holes were drilled to identify the burn line <br />in the B-Seam. Hole locations are shown on Map 9, Hydrologic Monitoring <br />Location Map. The Operator is considering constructing a new B-Seam <br />portal in lieu of accessing the B-Seam through ramps from the D-Seam. An <br />accurate location of the burn line is necessary to determine if a new portal is <br />feasible. The explorations holes will be drilled with a small skid mounted drill. <br />Hole diameters will be 6-inches or less. The average hole depth is 350-feet <br />• with a range in depth from 80 to 510 feet. The holes will be sealed in <br />accordance with Rule 4.07. Run-off from the drill pads and associated light <br />use roads/trails will be contained by sediment ponds B & C. <br />During 2002, one exploration hole KM-3 was drilled to assess the presence <br />of water in the old King Mine workings. The hole location is shown on Map <br />9, Hydrologic Monitoring Location Map. The hole was sealed in accordance <br />with Rule 4.07. Run-off from the drill pads will be contained by a sediment <br />fence as described above. <br />During 2003, the Operator intends to drill up to nine exploration holes. Five <br />will be drilled along Terror Creek and two will be drilled in Stephens Draw. <br />During 2003, the Operator intends to drill fourteen geotechnical holes for the <br />proposed new gob pile. Drilling will be from new light use roads so drill pads <br />are not required. <br />• MR-29 2.05 - 35 - 9/03 <br />A PPRov E~ <br />4/g~o3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.