Laserfiche WebLink
Laboratory Test Results <br />. Golder obtained QA samples SFa-11, SFb-09, SFb-10, SFc-03, SSFa-03, SSFb-02, and UFb-Ol of <br />Structural Fill (SF), Select Structural Fill (SSF) and Underdrain Fill (UF). Material met project <br />specifications. Test results aze presented in Attachment B. <br />Golder received concrete plug test results for concrete placed at UG-202, UG-234a, UG-246b, UG- <br />265, UG-278, and UG-521. Material met project specifications. A summary of test results aze <br />presented in Attachment B. <br />Meetines <br />CC&V held Weekly Contractors meetings on April 9a' and April 16a'. Items discussed include <br />Safety, 13nvironmental, Schedule, and CQA. The next weekly meeting will be held on April 23`a <br />2002 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />s <br />Bob Nichols <br />Resident CQA Monitor <br />PIweIVa 51 Apri19d0.EOC Golder Associates Inc. <br />