Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
failing Select Structural Fill test results and to remove the existing 18-inch CSP that ran along the same <br />alignment. Ames began to reconstruct the Phase Na PU starting from the ADR building working <br />North along the old ADR road. Ames excavated trench and placed geotextile, Underdrain Fill (UF), <br />• and Select Structural Fill (SSF) for approximately 300 feet of PU. Ames resumed construction of the <br />Phase IVa Secondary Underdrain (SU) by extending the previously constructed SU to the east by 40 . <br />feet. <br />Ames continued to remove Drain Cover Fill (DCF} from the edge of Phase I along the Phase I/Phase <br />IVa tie-in in preparation for final grading. <br />Ames continued placement of Concrete Plug (CP) concrete into "Deep Shaft" UG-456. Ames <br />placed three feet of concrete in accordance with IFC Drawing 12, Detail 1. <br />Ames continued placement of Cemented Rockfill (CR) into "Deep Shaft" at UG-456 by tapering the <br />working and placing 7 feet of CR in accordance with IFC Drawing 12, Detail 1. <br />Ames did not perform confirmation drilling in the Phase IVa azea during this reporting period. <br />Phase IVb <br />Ames continued Structural Fill (SF) placement and compaction activities in the eastern portion of the <br />Phase Nb footprint at the temporary access road neaz the old highway crossing, near station 3+00 of the <br />9640 access road, and west of the new LOB. Structural Fill materials were placed in horizontal lifts <br />typically not exceeding 2 feet in loose thickness. A Caterpillaz CS563C roller provided compactive <br />effort, while a Caterpillaz water wagon provided moisture conditioning when needed. Ames conducted <br />• slope recontouring activities at the West end of the temporary diversion channel and in the PSSA sump <br />area. <br />Ames resumed SF blast drilling in the Phase IVb at "Chicken Hawk Hill" and blasted on March 26a' <br />and 27a'. <br />Ames continued to remove Drain Cover Fill (DCF) from the edge of Phase III along the Phase <br />IIUPhase IVb tie-in in prepazation for local grading. <br />Ames did not perform confirmation drilling in the Phase Nb area during this reporting period. <br />Ames performed excavation remediation activities of known underground working UG-306. This <br />working was observed and verified to be a "Shallow Shaft" as defined in the drawings and will be <br />remediated accordingly. <br />Ames continued placement of Concrete Plug (CP) concrete into "Deep Shafts" UG-316, UG-317, UG- <br />478, UG-483, and UG-494. Ames placed three feet of concrete in accordance with IFC Drawing 12, <br />Detail 1. <br />Ames continued placement of Cemented Rockfill (CR) at UG-265, UG-548, UG-483, UG-316, UG- <br />317, UG-478, and UG-494 by tapering the working and placing 7 feet of CR in accordance with IFC <br />PheselVe SO Marthl4Aprilb.doc Golder Associates lnc. <br />