Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IV Weekly Summary No. 46 Page 3 003-2203 <br />UNK-9. Ames blasted underground workings delineated b~ confirmation drilling at UG-286 on <br />January 29a' at 16:30 and at UG-269 and UNK-9 on Febmary 6 at 16:30. <br />i (See Attachment A for approximate construction locations for all Phase IV azeas.) <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials were verified as suitable, and construction methods were in accordance <br />with project specifications. Removal of oversized and deleterious material from all fill areas was <br />observed. Golder conducted temperature measurements of fill material prior to placement. No fill <br />was placed until fill temperatures met the requirements of the specifications. <br />Golder observed cleazing and grubbing within the Phase )V area. All available topsoil was removed <br />and deleterious material hauled to Upper Arequa Gulch. <br />Golder observed construction of the 84-inch culvert at the south end of the Permanent Diversion <br />Channel. Golder observed that the material placed (CSP, Pipe Bedding Fill, and Structural Fill) met <br />the requirements of the specifications. <br />Golder observed placement of SF, SSF, and CSB. These materials were placed in accordance with <br />the drawings and specifications into excavated or open underground workings. Golder previously <br />obtained samples of SF, SSF, and CSB for laboratory testing. Materials supplied met specifications. <br />Ground Engineering conducted field testing and sampling of CP concrete as per specifications, and <br />• will supply strength results at the completion of 28-day testing. <br />Golder observed and documented excavation and remediation activities associated with the Phase N <br />underground working construction. Full time monitoring was given to excavation of underground <br />workings. <br />Golder observed and documented confirmation drilling activities associated with the Phase IV <br />construction. Full time monitoring was given to confirmation drilling of underground workings <br />including logging holes, mazking drill locations, surveying holes, and documenting underground <br />workings encountered. <br />Laboratory Test Results <br />Golder obtained QA samples SFa-09 and SFb-04 of Structural Fill being placed in Phase IVa and <br />Phase IVb. Test results will be presented upon completion of laboratory testing. <br />Golder conducted conformance sampling and testing of Tensaz UX1700HS geogrid delivered to site. <br />All lots sampled met project specifications and results are presented in Attachment B. <br />Golder began to conduct Conformance Testing of geomembrane being produced by POLYFLEX. <br />Test results on material produced to date indicate passing values with the exception of 80-mil <br />LLDPE role number PR-8-O1-0019-37 that failed to meet the minimum and average thickness <br />s <br />Phase Ne 46 Jv2]-Feb9.doc Golder Associates Inc. <br />