My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ ==Golder <br />ASSOClc'1teS <br />February 12a', 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 46: January 27 through February 9, 2002 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Na, b, and c Construction <br />Quality Assurance ~CQA) services performed for the Cresson Project during the period of January 27a' <br />through February 9 , 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from -1° F to 29° F, and highs ranged from 14° F to 51° F. Snow was recorded on January 30a', <br />31 s`, Februazy Ss', and 9~', 2002. Weather observations were made on twelve days of this fourteen-day <br />reporting period. <br />Construction Svnonsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on ten days of this <br />fourteen-day reporting period (January 28a' through February IS`, and February 4a' through February <br />8"') <br />Phase IVa <br />Ames placed Structural Fill (SF) in the Phase IVa azea at stations 44+00 through 48+00 of the <br />Permanent Diversion Channel and at stations 7+00 through 23+50 of the Perimeter Access Road. <br />Ames did not conduct slope recontouring in the Phase IVa azea during this reporting period. <br />Ames continued to excavate for the construction of the 84-inch CSP headwall. Ames continued <br />placement of 84-inch CSP and Pipe Bedding Fill (PBF). Ames placed approximately 30 feet of 84- <br />inch CSP and bedded the pipe with PBF and SF in accordance with the standazd detail shown on IFC <br />Drawing 15, detail 8. <br />i <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.