My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ ASSOC1~21teS <br />January 15a', 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 44: December 16, 2001 through January 12, 2002 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVa, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of December <br />16a', 2001 through January 12a', 2002. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from -7° F to 25° F, and highs ranging from 28° F to 56° F. Snow was recorded on January 2"a <br />and 10'", 2002. Weather observations were made on twenty days of this twenty-eight day reporting <br />period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on fourteen days <br />of this twenty-eight day reporting period (December 17a' through December 215`, January 2"a <br />through January 5 ,and January 7a' through January 12a'). <br />Phase IVa <br />Ames continued Structural Fill (SF) placement and compaction activities in the northern portion of <br />the Phase IVa footprint. SF materials were placed in horizontal lifts typically not exceeding 2 feet in <br />loose thickness. A Caterpillaz CS563C roller provided compactive effort, while a Caterpillaz water <br />wagon provided moisture conditioning when needed or required. SF material would also be placed <br />in the uncontrolled fill azea to the northeast of the fill when needed. SF was borrowed from the <br />slope recontouring activities neaz the 9640 road at station 18+00. <br /> <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.