My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IV Weekly Summary No. 43 Page 3 003-2203 <br />Ames continued placement of SF in Phase IVc at the saddle berm and below edge of pad stations <br />• 43+00 through 47+00. Ames conducted local cut to fill in this location. SF materials were placed in <br />horizontal lifts typically not exceeding 2 feet in loose thickness. A Caterpillaz CS563C roller provided <br />compactive effort, while a Caterpillaz water wagon provided moisture conditioning when needed or <br />required. <br />(See Attachment A for approximate construction locations for all Phase IV areas.) <br />Field Monitorins and Testin¢ Activities <br />Golder observed construction activities associated with Phase N earthworks. All construction <br />materials and soil materials were verified as suitable, and construction methods were in accordance <br />with project specifications. Removal of oversized and deleterious material from all fill areas was <br />observed. Golder conducted temperature measurements of fill material prior to placement. No fill <br />was placed until fill temperatures met the requirements of the specifications. <br />Golder observed clearing and grubbing within the Phase IV azea. All available topsoil was removed <br />and deleterious material hauled to Upper Arequa Gulch. <br />Golder observed removal of old HWY 67 pavement. Pavement was hauled to Upper Arequa Gulch. <br />Golder observed placement of geogrid at UG-243 through UG-245. Geogrid was placed in <br />accordance with the drawings and specifications over the designated azea. Golder obtained geogrid <br />samples of lots placed for conformance testing. <br />Golder observed and documented excavation and remediation activities associated with the Phase IV <br />underground working construction. Full time monitoring was given to remediation of underground <br />workings. <br />Golder received and reviewed Ames submittal #1 regazding Concrete Plug Mix design from Transit <br />Mix. The mix design submitted meets all the requirements of the specifications (Section 03320, <br />Concrete Plug) with the exception of the cement type. The mix design proposed Type I/II cement <br />and the specifications required Type V. Golder reviewed the submittal and found it to meet the <br />requirements for use as concrete plug concrete based on the technical data provided. Golder will <br />submit a letter documenting the acceptance of this submittal to CC&V. <br />Laboratory Test Results <br />Golder collected and tested samples of Structural Fill (SFc-O1) and Select Structural Fill (SSFc-O1) <br />from material placed in Phase IVc for laboratory testing. Material sampled met specifications and a <br />summary of test results aze presented in Attachment C. <br />Phue IVa 4J Dec2-IS doc Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.