My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ -- --Golder <br />-Associates <br />December 18a', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 43: December 2 through December 15, 2001 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVa, b, and c Construction <br />Quality Assurance (CQA~ services performed for the Cresson Project during the period of December <br />2"a through December 15 , 2001. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 8° F to 26° F, and highs ranging from 22° F to 52° F. Snow was recorded on December 7a' <br />and 12a'. Weather observations were made on twelve days of this fourteen-day reporting period. <br />Construction Synonsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on twelve days of <br />this fourteen-day reporting period (December 3`a through December 8a' and December l0a' through <br />December 15a'). <br />Phase IVa <br />Ames continued Structural Fill (SF) placement and compaction activities in the northern portion of <br />the Phase IVa footprint, in the Arequa Gulch area. SF materials were placed in horizontal lifts <br />typically not exceeding 2 feet in loose thickness. A Caterpillar CS563C roller provided compactive <br />effort, while a Caterpillaz water wagon provided moisture conditioning when needed or required. SF <br />material would also be placed in the uncontrolled azea to the northeast of the fill when needed. SF <br />was borrowed from the slope recontouring activities neaz the 9640 road at station 22+00. <br />Ames began to excavate the permanent diversion channel between stations 15+00 and 44+00, <br />including excavation for the construction of 84" CSP. <br />fr~ <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.