Laserfiche WebLink
GENERAL TERMS AND CONDITIONS: (IMPORTANTI READ ITEMS 6, 7, and B) <br />• <br />1. This permit is issued in reliance upon the accuracy and completeness of information supplied by the applicant <br />and is conditioned upon conduction of the activity, or construction, installation and operation of the source, in <br />accordance with this information and with representations made by the applicant or applicant's agents. It is valid <br />only for the equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been deter- <br />mined by the APCD to be necessary to assure compliance with the provisions of C.R.S. 1973, 257-114(4xg) <br />and, as such, shall be enforceable under the provisions of C.R.S. 1973, 25.7-115 after final approval of the permit <br />has been granted. Emission limits are imposed to ensure that emissions will not (1) interfere with reasonable <br />further progress Otxvard attainment of the NAAQS for polutants as required by C.R.S. 1973, Sections 257-114(4x9xfl(B) <br />and 257-301(1); Section 172(b)(3) of the Federal Clean Air Ad, 42 USC 7502 (bx3); and Suction IV.D.2. of the <br />Air Quality Control Commission Regulation No. 3 or (2) result in an exceedance of the NAAQS for pollutants <br />as required by C.R.S. 1973, Sections 25-7-102, 25-7-105(1Naxl), and 25.7-201(1xb); Section 165(ax3) of the Clean <br />Air Act, 42 USC 7475(aK3); and Section IV.D.1.c. of Air Quality Control Commission Regulation No. 3. <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to, or appeal <br />,f, a condition hereof shall constitute a rejection of the entire permit and upon such occurrence this permit shall <br />oe deemed denied ab initio. This permit may be revoked at any time prior to final approval by the Air Pollution <br />Control Division (APCD) on grounds set forth in the Colorado Air Oualiry Control Act antl regulations of the Air <br />Quality Control Cgmmission (AQCC), including failure to meet any express term or condition of the permit. <br />4. This permit and any required attachments must be retained and made available for inspection upon request at <br />the location set forth herein: With respect to a portable source which is moved to a new location, a copy of the <br />revised Air Pollutant Emissions Notice (APEN) (required by law to be submittetl to the APCD whenever a portable <br />• source is relocated) should be attached to this permit. The permit may be reissued to a new owner by the APCD <br />as provided in Section 111.8. of AQCC Regulation No. 3 upon a request for transfer of ownership. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this activity or operation <br />of this source. Final approval of the permit must be secured from the APCD in writing in accordance with the <br />previsions of C.R.S. 1973, Section 25-7-tt4(4)(j) and Section IV.H. of AQCC Regulation No. 3. Final approval <br />cannot be granted unfit the operation or activity comn;ences and has been verified by the APCD as conforming <br />in all respects with the conditions of the permit. If the APCD so determines, it will provide written documentation <br />of such final approval, which does constitute "final" authority to operate. <br />6. THIS PERMIT AUTOMATICALLY EXPIRES IF you (1) do not commence construction or operation within 1B months <br />after either the date of issuance of this permit or the date on which such construction or activity was scheduled <br />to commence as set forth in the permit, whichever is later, (2) discontinue construction for a period of 18 mo~,ths <br />or more, or (3) do not complete construction within a reasonable time of the estimated completion date. Exten- <br />sions of the expiration date may be granted by the APCD upon a showing of good cause by the permittee. <br />7. YOU MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to commencement of <br />the permitted operation or activity. Failure to do so is a violation of C R.S. t973, Section 25-7-t t4(4)p) and Regula- <br />tion No. 3., Section IV.H.1., and can result in the revocation of the permit. <br />8. YOU MUST obtain final approval within six months of the commencement of operation as that term is defined <br />by the AQCC. Failure to obtain I~nal approval will result in the revocation of the permit. <br />9. Violation of the terms of a permit which ties received final approval or of the provisions of the Colorado Air pual~ty <br />Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions <br />under C.R.S. 1973. Sections 2`r7-t t5lenforcement), 25-7-12t (injunctions), 25.7-t22 (civil penalties) and 25-t-t t4 <br />(criminal penalties). <br />APCD~BJ~IRE.V tW&31 <br />