-- <br />W(i'I Response: <br />A Bridge crossing is to be utilized. An approved plan for a bridge crossing from the Army <br />Corp of Engineers will be completed and submitted to The DMG prior to mining on the <br />site. <br />EXHIBIT E -Reclamation Plan <br />DMG: <br />Under the legal description and the Phase I and II azeas' acreage, the permit is for 37.41 acres. <br />However; on the reclamation plan, the breakdown is as follows: 24.25 acres as ponds and <br />8.69 acres to be reclaimed for a total of 32.9 acres. Please explain the discrepancy. Are the <br />rest of the acreages not to be disturbed, therefore, not requiring reclamation or are they <br />considered minor disturbances? <br />WGI Response: <br />The balance of 4.51 acres is a combination of undisturbed and minor disturbances that should <br />not require reclamation. The Undisturbed areas will be adjacent to the bridge crossing. The <br />minor disturbances are primarily on the perimeter of the mine site. <br />EXHIIiIT S -STRUCTURES <br />DMG: <br />Are there any manmade structures within 200 feet of the permit areas which could be <br />adversely impacted by the mining operation? <br />WGI Response: <br />There are structures within 200 feet of the disturbed areas; a sewer line owned by West <br />Montrose Sanitation District, a Power Transmission line owned by Tristate Power and <br />Generation Co. And two Pole Barn shelters for livestock owned by the permit area land <br />owners. Damage agreements are currently being prepared for the potentially affected <br />structures, and will be forwarded to DMG as soon as they are complete. <br />I hope that these responses are adequate to meet the concerns of the DMG. If additional information <br />is necessary please contact Mr. Brian Wilson with EARTH /STONE Ltd'. at (970)-874-5183. <br />Sincerel <br />~~~~ <br />Joeseph DeVincentis <br />President WGI <br />es\bw\jd <br />c ~oeeice.wvwirv~urvoocswcni+R-xwneortevi.wvo <br />