Laserfiche WebLink
<br />• iii iiiiiiiiiiiii iii <br />WESTERN GRAVEL, INC. <br />Qcr`FiV~~ <br />JUL 0 3 1996 <br />plvlblan tlt Mlndittld & Ge010Jy <br />Berhan Keffelw <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, Colorado H0203 <br />M - 46 ~D~ <br />RE: Adequacy Review- Western Gravel, Inc. - File I3o. Tai~6 <br />Dear Mr. Keffelew: <br />June 26, 1996 <br />The following is Westem Gravel Inc.'s response to the Divisions Adequacy Review. Comments <br />have been arranged by repeating the Divisions concerns followed by Westem Gravel Inc.'s <br />response <br />EXHIBTI' D -Mining Plan <br />DMG: <br />On Page 4 it is stated that " a river crossing ,either by bridge and /or conveyor, located on <br />the northeast side of the site will be constructed and also used for access and transporting <br />materials from the site". <br />WGI Response: <br />The decision has been made to use a bridge crossing. <br />DMG: <br />On Page 10, under stream crossing, it is stated "If a bridge is installed, it will remain upon <br />completion of the operation for use by the landowners. If a conveyor is erected and used <br />to transport material across the river, it will he removed as part of the reclamation plan." <br />The Division, in order to evaluate the financial warranty, requires the following <br />information: <br />1) Is a conveyor system going to be erected to transport the material? If so, please <br />submit a detailed design, which includes length and width and associated support <br />structures <br />2) Please submit the approved plan from the Army Corps of Engineers for the <br />bridge. <br />31101 N. Toy: nsend Ace. • M1lontmse. CO SI4UI (9iU1 ?19-'3h31 EA\: (91111 349 Oa90 <br />