Laserfiche WebLink
Agency or organization name :DMG <br />Permit or iob action :NEW 112 APPLICATION <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -CUT SLOPES TO 3:1 NA 2 604.0 $187,539 <br />002 -SPRAD 12 INCHES OF TOP SOIL NA 2 117.0 $33, 960 <br />003 -HAUL ROAD A DITCH CROSSING REMOVAL NA 1 12.0 $4,308 <br />004 -SEED AND MULCH ARE ABOVE WATER LINE NA 1 34.0 $15,748 <br />005 -PLANT 50 COTTON WOOD TREES NA 1 24.0 $12,500 <br />006 -MOB/DEMOB EQUIPMENT NA 1 3,500.0 $3,500 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 4,291.0 $257,555 <br />' inGudes inflatlon factoradjustment of: NA % TOTAL DIRECT COST • - 5257,555 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Llabillry InSUranCe : 1.55 % Of direct total = $3,992 <br />Performance bond : 1.05 % of direct total = $2, 704 <br />Job superintendent : 2145.50 hrs*...$/hr: $35.00 total = $75,092 <br />Profit : 10.00 % of direct total = $25,756 <br />'assume net hours=50%or task hours TOTAL 08P= $107,544 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $365,099 <br />Financial warranty processing (legalfrelated costs) : total = <br />Engineering work and/or contracUbid preparation : 4.25 % of Intr. NA total = $15,517 <br />Reclamation management and/or administration : 5.00 % ofcntr. NA total = $18,255 <br />CONTINGENCY- ~ NA' NA total= NA <br />•can6ngencies accounted for at task level TOTAL INDIRECT COST= 5141,316 <br />TOTAL BOND AMOUNT (direct+ Indirect) = 5398,871 <br />