My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125760
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:06 PM
Creation date
11/25/2007 2:24:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
Permit File
Doc Date
7/16/2004
Doc Name
Adequacy Comments
From
DMG
To
Tetra Tech RMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 07/142004 <br />User : 8MK <br />State :Colorado <br />County :Adams <br />Site :Hazeltine Prt <br />PermiUjob# :M-2004-031 <br />Abbreviation :none <br />Filename :M031-002 <br />Agency or organization name :OMG <br />Permit or other job action :NEW 112 APPLICATION <br />Task description :SPREAD 12 INCHES OF OVERBURDEN/TOP-SOIL <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series !I - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $43.83 NA <br />Operating cosUhour : $69.48 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cosUhour : $31.83 NA <br />Total unit cosUhour : $145.14 Total fleet cosUhour : $290.28 <br />MATERIAL QUANTITIES <br />volume: 57,200 CCY <br />factor: 1.215 volume: 69,498 LCY <br />Source of estimated volume :EXHIBIT S <br />Source of estimated swell factor :EXHIBIT 5 <br />_. , <br />. >: >. ;; <br />HOURLY PRODUCTION Job Conditicn Correction Factors Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 377.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />2.00 % (~ <br />5,040 feet <br />1,600 Ibs/LCY <br />Horsepower : 310 <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />594.04 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 118.99 Hours <br />Unit cost : $0.489 /LCY Totai job cost : $33,960 <br />0.75 <br />1.00 <br />1.20 <br />1.00 <br />0.83 <br />0.70 <br />1.05 <br />1.44 (Cat <br />1.00 (S/SI <br />0.79 <br /> <br />297.02 LCY/hr <br />
The URL can be used to link to this page
Your browser does not support the video tag.