Laserfiche WebLink
8/10/97 <br />• <br /> Table A-1. Facilities Removal Calculations Page 3 of 5 <br /> FACILITY/STRUCTURE UNIT OUANTIN UNIT EXTENDED ESTIMATED <br /> COST COST COST <br /> STORAGE TANK REMOVAL (continued) <br /> Concrete: <br /> Flat Sq. Ft. 8,500 52.11 f13,715 <br /> Vertical Sq. FL 33C 57.07 (2,333 <br /> Disposal Cu. Yd. 100 35.30 (530 <br /> SUB-TOTAL (STORAGE TANK REMOVAL) (27,978 528,000 <br /> FUEL STORAGE TANK SLUDGE REMOVAL {296 of vdums (8 tanks): 6,300 palbna} <br /> Vacuum Truck Hour 4 (100.00 (400 <br />i Transport Mile 200 (4.40 1880 <br /> Disposal Ton 28 (200.00 55.200 <br /> SUB-TOTAL (8,480 58.000 <br />• RT <br />F <br />V <br />VAL WO <br />H <br />ET E130 <br />758 (131 <br />000 <br /> ran CULVERT R <br />CULVE <br />REMOVAL E <br />O RKS <br />E , , <br /> POWERLINES Feet 70,800 (1.88 5133,104 5133,000 <br /> INDUSTRIAL WASTE POND (NON-HAZARDOUSI <br /> Pick-Up: <br /> Slid Ton 15 5275 54,125 <br /> Liquid Hour 12 f92 (1,104 <br /> Transport <br /> Sdid Mile 200 53.05 (770 <br /> Liquid Mile 200 (4.40 (880 <br /> Sump d Tanks Each 3 51,100 53,300 <br /> Disposal Ton 18 5200 E3,800 <br /> SUB-TOTAL (INDUSTRAL WASTE POND) (13,779 514,000 <br /> MISCELLANEOUS STRUCTURES <br /> Tvs Shed (skid-naunEed) Cu. Ft 8,000 f0.18 51,080 <br /> Main Substation Cu. Ft 8,000 50.18 (1,080 <br /> Concrete: <br /> Flatwork Sq. Ft 1,200 52.91 (3,492 <br />_ Disposal Cu. Ft 23 (5.30 5122 <br /> Portables (4-total) Cu. Ft. 4,200 50.18 53,024 <br /> 58,798 <br />xis <br />l~1AY i ~ 9~:;:~ <br />