Laserfiche WebLink
<br />RECLAMATION PLAN <br /> <br />Following completion of mining oper~ns, the excavate pit <br />After-res ing is completed, topsoil will be spread to a depth <br />of 3 to 1~ ches. Topsoil will be augmented with reje ted <br />crusher nes as necessary. All excavated or disturbed areas <br />will receive topsoil application. The berms formed fro crusher <br />reject materials will be left to help divert possible f ood <br />waters from the two small streams along their original <br />floodways. <br />Following topsoil application, the surface will be seedel with <br />suitable plant species to prevent excessive erosion and <br />approximate the original environmental conditions and wildlife <br />habitats. Seeding success will be aided by fertilizing nd <br />mulching as follows: <br />walls will be graded to a slope of 3:1 or flatter. The pit floor <br />will be reshaped to approximate the urface of the original <br />topography. Most reshaping work will be performed usin <br />bulldozers. <br />