My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125262
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:42 PM
Creation date
11/25/2007 1:41:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000118
IBM Index Class Name
Permit File
Doc Date
9/27/2000
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~ <br /> <br />CIRCES Cost Estimating Software <br />B~DOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />Task p : OQ4 Stale :Cpbredo PermiVjob A : M•2000.118 <br />Date: 0927?000 Counry:Huer7eno Abbreviation :none <br />User: JCS Site:Pino Pit Filename M718-004 <br /> <br />Permit or other job action :ESTIMATE RECLAMATION CAST <br />Task description :SCARIFY COMPACTED AREAS <br /> <br />HOURLY EQUIPMENT COST Basic machine :Ce! DBN (1996) Horsepower: 285 <br />Blade type :Universal <br />AHachment no. 1 : ROPS Ceb Shill basis : 1 per eey <br />AHachment no. 2 :3-shank ripper <br /> Utilization % Cast tlata source : (CRG) <br />Cost Breakdown' Ownership tosUhour: 541.30 NA <br />Operating cosUhour: 555.90 1pD <br />Ripper op. cosVhour: 56.94 100 <br />Operator cosUhour: 523.12 NA <br />Total unit cosVhour: 5727.26 Total lleet cosVhr: 5127.26 <br />Seismic <br />methotl <br />Area <br />method <br />Selected estimating methotl : Area <br />NA NA Loatl lector: NA Bank volume: /VA BCV <br />15.00 Acres Rip depth (H): 1.00 volume : 24,200 BCY or CCY <br />Source of quantity take-oH :PERSONAL ESTIMATE <br />Source of material load lector : NA <br />HOURLY PRODUCTION <br />Seismic method ' <br />Material Seismic velocity : NA feet per secontl <br />Unadjusted houdy production : NA BCY or CCY/hr <br />Average upping depth per pass : 1.00 lest <br />Average ripping width per pass : 7.OB leer <br />Average ripping length per pass : 500.00 feet <br />Average velocity of machine : 88.00 leer per minute <br />Average machine maneuver time /pass : 0.25 minutes <br />Houdy production per unit area : 0.822 acres per hour <br />Unadlusted hourly production : 1,326.18 BCY or CCY/hr <br />Unadjusted houdy producion : f,326.1H BCY or CCY/hr <br />Site altitude : 6,300 leer <br />Altitutle adlusimeni . 1.00 (CB7 HB) <br />Job efficiency factor: 0.83 (15hiWday) <br />Net job correction: O.d3 multiplier <br />Adlusted houdy unit production : 1,100.73 BCV or CCV/hr <br />Adjusted hourly fleet production : 1,100.73 BCY or CCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozers) <br />Unit cost: 50.116 A.CY <br />Total job time : 21,99 Hours <br />Total job cost : 12,798 <br />
The URL can be used to link to this page
Your browser does not support the video tag.