Laserfiche WebLink
i <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agency or organization name :OMG <br />Taskp: 003 State :Cobreo'o PermiVObp :IN-?008.118 <br />Date: 09272000 Counry:HUedano Abbreviation :none <br />User: JCS Site:Pino Pir Filename :M1/8~003 <br />Permit ar other job action :ESTIMATE RECLAMATION COST <br />Task description :SPREAD TOPSOIL <br />HOURLY EQUIPMENT COST Basic machine :Car DeN (1998) Horsepower: 285 <br />Blade type ~ Urm~ersal <br />AHachment no. I : ROPS Ceb Shill basis : 1 per day <br />AHachment no. 2 :3~shenk ripper <br /> <br /> Utilization % Cost data source : (CRG) <br />Cost &eakdown : Ownership cosVhour'. 541.30 NA <br />Operating cosuhour : 555.917 100 <br />' Ripper op. cosVhour : 50.00 0 <br />Operator cosUhour: 523.12 NA <br />Total unit cosUnour: 5120.32 Total fleet cosVhour: 8120.32 <br />MATERIAL QUANTRIES <br />i <br />Initial Swell Laose <br />volume: 18,000 LCY factor: NA volume: 18,000 LCY <br />Source of quantity take-off :PERSONAL ESTIMATE <br /> <br />Source of est. swell favor :PROGRAM <br /> <br />HOURLY PRODUCTION <br />vin <br />F tr <br />Average push distance : 300 feet Source <br />Unatljusted hourly production : 344 LCY/hr <br />Material consistency description <br />Pertly cronsol7dafrxr SrpckN'IB <br />Average push gratlient: 10.00 %(neg) <br />Average sne altiwde : 6.300 leer <br />Material weight : 2.580 1651LCV <br />Matedal weight descrtplion <br />Eenh - On sacked <br />Operator skill <br />Material consistency <br />Dozing melhotl <br />Visibility <br />Job efficiency <br />Spoil pde <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correnion <br />Adjusted unit protluction <br />Adjusted Ilee1 produdion <br />0.75 (avg.) <br />1.10 (Car HB) <br />1.00 (9en.) <br />1.00 lava) <br />1.22 <br />I.00 <br />0.61 <br />209.41 LCV/hr <br />208.47 LCYBir <br />JOB TIME AND COST <br />Fleet size: 1 Dozers) Total job time: 86.37 Hours <br />Unit cost : 50.577 /LCY Total job cost : 570,392 <br />