Laserfiche WebLink
<br />Table A-1. Facilities Removal <br />FacilitylStrudure <br />Unft F~tended <br />Unit Quantity Cost Cost <br />Molly Brown Tub Pad <br />Concrete: <br />Flatwork (Erection Pad 70k70k6", reinf) Sq. Ft. 4,900 $1.99 $9,757 <br />Flatwork (Transformer Pad (15k14k4") Sq. Ft. 225 $1.00 $224 <br />Disposal Cu. Yd. 124 $5.44 $675 <br />Railroad Track Panels L.F. 624 $6.52 $4,068 <br /> <br />Subtotal (Molly Brown Tub Pad) $14,72N -{ <br />Babv Doe Tub Pad <br />Concrete: <br />Flalwork (Erection Pad 70k70k8", reinf) Sq. Ft. 4,900 $1.99 $9,757 <br />Disposal Cu. Yd. 124 $5.44 $675 <br />Railroad Track Panels L.F. 624 $6.52 $4,068 <br />Subtotal (Baby Doe Tub Pad) $14,500 '~{' <br />• <br />Miscellaneous Items <br />Radio Tower Each 1 $580.00 $560 ~ <br />Scrapyard and Storage Cu. Ft. 84,000 $0.13 $10,937 °'"' <br />Poles and Lighting Each 20 $175.00 $3,500 <br />Waste Drum Disposal (Non Hazardous) 55 gal. Drum 70 $160.00 $11,200 ~ <br />Buried Utilities Lump Sum 1 $2,318.00 $2,318-" <br />Rip Facilities Area (D10R) BCY 80 667 $0.23 $if3 553 S -r <br />Subtotal (Miscellaneous Items $47,088 <br />Subtotal - Att Facilities $1,312,100 <br />Area Adjustment Factor 0.889 <br />GRAND TOTAL FACILITIES REMOVAL $1,166,457 <br />V ~..rrt '1I,w, <br />.atm. ,..~l.~r'c- n~ <br />