Laserfiche WebLink
<br />Table A-1. Facilities Removal <br /> Unft Extended <br />FacilitylStructure UnR Quantity Cost Cost <br />Industrial Waste Pond (Nan-Hazardous) <br />Pick-up: <br />Solid Ton 15 $325.00 $4,875 <br />Liquid Hour 12 $100.00 $1,200 <br />Transport <br />Solid Mile 200 $3.15 $630 <br />Liquitl Mile 200 $4.30 $860 <br />Sump and Tanks Each 3 $1,280.00 $3,840 <br />Disposal Ton 18 $250.00 $4 500 <br /> <br />Subtotal (Industrial Waste Pond) ~ 15,905 y~,,,,,~ ._bL..; °; <br />Miscellaneous Structures <br />Tire Shed Cu. Ft. 6,000 $0.13 $761 <br />Main Substation Cu. Ft. 6,000 $0.13 $761 <br />• <br />Concrete: $0 <br />Flatwork Sq. Ft. 1,200 $1.49 $1,792" <br />Disposal Cu. Ft 23 $0 <br />Portables (4 Total) Cu. Ft. 4,200 $0.13 $547'' <br />ANFO Silos and Emulsion Tank $0 <br />Structures Cu. Ft. 10,940 $0.13 $1,424 ~ <br />Concrete Sq. Ft. 1,162 $1.49 $1,735 <br />Footings Feet 52 $5.97 $311 <br />Disposal Cu. Yd. 66 $5.44 X35-..8~ -F <br />Explosive Storage $0 <br />Magazines (3 Total) Cu. Ft. 2,560 $0.13 $333 <br />Trailer (Magazine) Cu. Ft. 2,560 $0.13 $333 '' <br />Fence Feet 620 $2.03 r$1,259? -} <br />Subtotal (Miscellaneous Structures) $9,656 <br />Dractine Repair Pad (Queen Anne) <br />Concrete: <br />Flatwork Sq. Ft. 4,900 $1.99 $9,757 -- <br />Disposal Cu. Yd. 121 $5.44 $6 8~ -{- <br />Subtotal (t]ueen Anne Repair Pad) $10,415 <br />