My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1981044A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981044
>
2001-12-11_PERMIT FILE - C1981044A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 7:01:13 AM
Creation date
11/25/2007 1:23:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 02 OTHER REQUIRED PERMITS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PART I <br />Page lc of 19 <br />Permit No.: CO-003414E <br />A. TERMS AND CONDITIONS (Continued) <br />3. Effluent Limitations (Domestic) for Outfall U23 <br />During the period beginning no later than immediately and lasting <br />through December 31, 1990, the permittee is authorized to discharge <br />from outfall aerial number(s): U23 <br />• <br />Effluent Parameter Discharge Limitations <br /> Maximum Concentrations <br /> 30-day avg. a/ 7-day avg. b/ Daily Max. c/ <br />BODS, mg/1 (lbe/day) 30 (3.0) 45 (4.5) N/A <br />Total Suspended Solids, mg/1 75 (7.5) 11U (11.0) N/A <br />(lba/day) <br />Fecal Coliforms, Number/lUU ml n/ tiODU 1L000 N/A <br />Total Residual Chlorine, mg/1 N/A N/A 0.5 1/ <br />Flow, MGD 0.012 N/A N/A <br />Salinity, mg/1 N/A N/A N/A <br />011 and Grease shall not exceed 10 mg/1 c/ in any grab sample nor shall there <br />be a visible sheen. <br />pH - unite shall remain between 6.0 and 9.7 c/. <br />4. DELETED <br />5. Expansion Requirements (Domestic) <br />Pursuant to Colorado Law, C.R.S. 1973 25-U-SO1 (5) and state discharge <br />permit regulation 6.9.3 (12), the permittee is required t-o initiate <br />engineering and financial planning for expansion of tl:e domestic <br />wastewater treatment works whenever throughput and treatment reaches <br />eighty (8U) percent of the hydraulic or organic design capacity. <br />lhenever ninety-five (95) percent of either the hydraulic or organic <br />design capacity of the treatment works is reached, the permittee shall <br />commence construction of the necessary treatment expansion. <br />The design capacity of this domestic wastewater treatment works is <br />0.012 MGD for hydraulic flow and l5 lba DODg per day for organic <br />loading. <br />See Part I.C. for Footnotes. <br />Amended /.;/ ~G• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.