Laserfiche WebLink
~• <br />-~ \ J <br />Page 3 <br />ADDITION.TO EXHIBIT C MINING PLAN <br />2. The waste rock and overburden encountered in mining operations <br />will be utilized as stockpile pads immediately adjacent to the <br />pit. Upon completion of mining operations this material can <br />either be pushed or hauled back into pit to be used in sloping <br />high walls. Should there not be sufficient waste rock to construct <br />final degree of backslope on pit walla, then drilling and shooting <br />pit walls will be done to accomplish final grade. This can be <br />done within permit boundaries. Pit floor will be sloped to drain <br />as well as temporary ditching around top of pit to direct water <br />away from topsoiled and seeded areas until growth takes place. <br />I also left comment date March 22. Ae we have already sent noti- <br />fications to all owners. <br />