Laserfiche WebLink
r <br /> <br />- n <br />~~ <br />Page 2 <br />EXHIBIT C MINING PLAN (CONY') ' <br />I' <br />5. We are currently inspected on this pit by Mine <br />Safety and Health Administration (MSHA). As this <br />pit hae been in operation for over 20 years, I feel <br />i.ilat should be sufficient evidence there will be no <br />blasting damage to off site structures. <br />6. There were no diversions shown •a round upper side of <br />operation as this pit is located near the top of the <br />plateau. Disturbed area run of:f will be directed <br />into dike shown on mine plan map. If further sedi- <br />ment ponds are necessary these can be installed with <br />no problem. <br />7. List is attached. <br />EXHIBIT D RECLAMATION PLAN: <br />1. Will be reclaimed per Soil Conservation Service <br />specifications. <br />2. Pit will drain. <br />EXHIBIT E MINING AND RECLAMATION MAP: <br />1. See Attached. <br />FINANCIAL WARRANTY: <br />A $5,000.00 Bond #5334188 is secured) with the Linden <br />Insurance Company through Safeco Company. Written <br />confirmation of this has not arrived through the mail. <br />Can be confirmed verbally by Bob Cox at the Linden Co. <br />Telephone number (303)458-1133. <br />