My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125005
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:30 PM
Creation date
11/25/2007 1:19:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
6/8/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR67
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatins~ Software <br />Task # : 235 <br />Date : 08/072006 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />PermiUjob# : C-1996-083 <br />Abbreviation :none <br />Filename : C083-235 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Minor Revision 67 <br />task description :Replace Topsoil from Sfoc <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />fo <br />Road <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cost/hour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cosUhour <br />Total unit cost/hour <br />volume : 1.000 CCY <br />Shift basis : 1 per day <br /> <br /> <br />$56.94 Data source : (CRG) <br />Utilization <br />NA <br />$104.98 100 <br />$0.00 0 <br />$32.53 NA <br />$194.45 Total fleet cosUhour : $194.45 <br />Swell Loose <br />factor : 1.125 volume : 1,125 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY~PRODUCTION ~ ~~ Job Condition Correction Factors ~~ ~~~Source ~ ~~~ <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rfJ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7, 600 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 350.93 LCY/hr <br /> Adjusted fleet production : 350.93 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.554 /LCY <br />Horsepower: 405 <br />Total job time : 3.21 Hours <br />Total job cost : $623 <br />
The URL can be used to link to this page
Your browser does not support the video tag.