My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125005
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:30 PM
Creation date
11/25/2007 1:19:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
6/8/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR67
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />34 State :Colorado Permit/job# : C-1996-083 <br />Task # : 2 <br /> :Delta Abbreviation :none <br />unt <br />C <br />Date : 06/072006 y <br />o <br /> 2 Mine Filename : C083-234 <br />:Bowie No <br />Sit <br />User : JRS . <br />e <br />or organization name : <br />enc <br />A Colorado Division Of Minerals And Geology <br />y <br />g <br />Permit or other job action : Minor Revision 67 <br />Task description : Replace Topsoil from Stockpile to Drill Pads <br />;, .:. <br />HOURLY ~~EQUIPMENT COST <br /> <br />405 <br /> Basic machine : Cat D9R - 9SU Horsepower : <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $56.94 NA <br /> Operating cosUhour : $104.98 100 <br /> Ripper op.cosUhour: $D.00 0 <br /> Operator cosUhour : $32.53 NA <br /> Total unitcost/hour : $194.45 Total fleet cosUhour : $194.45 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />factor : 1.125 volume : 1,800 LCY <br />volume : 1,600 CCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % (I <br />Average site altitude : 7,600 feet <br />Material weight <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.406 /LCY <br />2,550 Ibs1LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 0.95 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Source <br />Adjusted unit production : 479.16 LCYIhr <br />Adjusted Fleet production : 479.16 LCY/hr <br />Total job time : 3.76 Hours <br />Total job cost : $730 <br />
The URL can be used to link to this page
Your browser does not support the video tag.