Laserfiche WebLink
• Table tA~. Calculations for time required for topsoiling page 2 <br />Derringer I Enfield Pits <br />Produetlort Adjusted' Fleet <br />Route Route Cubic Rate Productkm Scraper FIee1 Cost Total <br />From To Yards (cydsllrr) (cydslbrJ Hours Hours Jimr) (S) <br />D97-2 Elk Pond (West) 2,220 255.23 255 8.7 1.1 2339.02 2,543 <br />EG1 Elk Pond (East) 1,027 667.96 668 1.5 0.2 2339.02 450 <br />D92-1 Deer Gulch Porxt 2,330 478.94 479 4.9 0.6 2339.02 1,422 <br />D97-2 DR7 D Pk 14,412 465.22 465 31.0 3.9 2339.02 9,058 <br />D92-1 DR2bPrt 21,188 471.88 472 44.9 5.6 2339.02 13,128 <br />D96-2 DR3 D Pit 30,464 321.58 322 94.7 11.8 2339.02 27,698 <br />E79$ DR4 DE Pi[ 8 llte 1 208,968 149.84 150 1394.6 174.3 2339.02 407,752 <br />E935 DRS DE Pit 53,610 309.94 310 173.0 21.6 2339.02 50,572 <br />E87-12 DR6 DE Pit 73,278 229.54 230 319.2 39.9 2339.02 93,338 <br />E79A DR7 SouUr D Road 34,010 144.36 144 235.6 29.4 2339.02 68,882 <br />E78.1 DR8 DE Pit 10,000 166.60 185 59.3 7.4 2339.02 17,341 <br />E7&2 DR9 DE Pit 25,238 197.80 198 127.6 15.9 2339.02 37,305 <br />E93~ DR10 DE Pit 16,746 239.46 239 69.9 8.7 2339.02 20,447 <br />E94-1 DR70 DE Pd 2,304 220.34 220 10.5 1.3 2339.02 3,057 <br />D97-1 DR10 DE Pit 49,168 411.05 411 119.6 15.0 2339.02 34,973 <br />LG7 DR11 DE Pit 90,858 289.20 289 3142 39.3 2339.02 91,856 <br />D98-1, E942 & SC- DR12 DE Pil 33,247 468.91 469 70.9 8.9 2339.02 20,730 <br />ASH1 DR14 DE Pit 56,867 199.67 200 284.8 35.6 2339.02 83,271 <br />A91~8 DR15 D Pit & Road 31,960 145.73 146 219.3 27.4 2339.02 64,121 <br />A76~i DR16 D Road Chieker 7,805 297.36 297 262 3.3 2339.02 7,674 <br />• <br />E89.11 E79E EnDance 1,100 228.51 229 4.8 0.6 2339.02 1,407 <br />Total 766,800 212 212 3615.3 451.9 2339.02 1,057,026 <br />Z Pk )a.k.a. East F Pit) <br />Production Adjusted' Fleet <br />Route Route Cubie Rate Production Scraper Fleet Cost Total <br />From To Yards (cydsRrr) (cyds8rr) Hours Hours JSerr) (S) <br />A98-2 ZR7 Z Strike 80,332 249.55 250 321.9 40.2 2339.02 94,118 <br />A98-1 ZR6Z Strike 45,248 352.71 353 128.3 16.0 2339.02 37,508 <br />A94.4 ZRS Z Strike 124,880 244.55 245 510.7 63.8 2339.02 149,303 <br />PRO ZTS-2 ZR4 Z Strike 45,144 443.51 444 101.8 12.7 2339.02 29,761 <br />ZTS-1 ZR3 Z Strike 133,476 391.76 392 340.7 42.6 2339.02 99,616 <br />9HRS ZR2 Z Strike 18,250 270.27 270 67.5 8.4 2339.02 19,743 <br />ZTS-3 ZR1 Z Strike Pd 128,436 291.15 291 441.1 55.1 2339.02 128,977 <br />Total 575,766 301 301 1912.0 239.0 2339.02 559,026 <br />1-44 <br />