Laserfiche WebLink
• Table 1A~. CakuWtions for time required for topsoiling <br />Ash Dump <br />Production Adjusted" Fleet <br />Route Route Cubic Rate Producton Scraper Fleet Cost Total <br />From To Yards (cydslhr) (cyds111r) Hours Houn (Emr) (S) <br />A88-1 AR1 Ash Dump 60,460 373.43 373 162.0 20.2 2339.02 47,353 <br />A931 ARZ Ash Dump 86,454 306.50 309 280.2 35.0 2339.02 81,936 <br />H93.' AR3 Ash Dump 82,228 268.26 268 306.5 38.3 2339.02 89,621 <br />ASH2 AR4 Ash Dump 27,486 291.75 292 94.2 11.8 2339.02 27,545 <br />A92-2 ARS Ash Dump 179,676 306.72 307 565.8 73.2 2339.02 171,274 <br />A92-1 AR6, LOM 8 FS Road 199,654 215.29 215 927.4 115.9 2339.02 271,143 <br />AB6b AR7 Ash Road 49,932 274.OD 274 182.2 22.8 2339.02 53,281 <br />A91.8 ARB Weat Ash Road 10,224 202.83 203 50.4 6.3 2339.02 14,736 <br />H93-1 AR9 Ash 8 Walk Roar 63,981 219.98 220 290.8 36.4 2339.02 85,038 <br />JG7 8 JGB AR10 LOM Road 21,315 356.71 357 59.8 7.5 2339.02 17,471 <br />JG6 AR11 LOM Road 13,212 458.75 459 28.8 3.6 2339.02 8,420 <br />Trial 794,642 268 268 2968.1 371.0 2339.02 867,819 <br /> <br />1-43 <br />