Laserfiche WebLink
be necessary because the exterior slopes will be done as mining progresses. The time when <br />it would be most expensive to reclaim the site is when mining ends and only recoiling and <br />revegetation is needed. The table below outlines the vazious azeas of disturbance at the time <br />explained above. A dozer will be used to do the shaping and recoiling. The revegetation <br />cost figure used includes fertilizer, grass seed, labor and drilling costs. <br />STAGE TOTAL SOIL DEPTH <br />Needing Recoiling 9.06 10" <br />Revegetation Area 9.06 <br />Resod @ 10" 13,581 cubic yazds <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />Unit Cost <br />1. Revegetation areas includes grass seed, fertilizer and labor to drill...... $400.00/ac. <br />2. Respreading soil and/or growth media with dozer push distance I00 <br />feet or less .................................................. $ 0.122/yd' <br />RECLAMATION COSTS <br />1. Revegetation, 9.06 acres @ $400.00/ac $3,624.00 <br />la. Secondary revegetation 9.06 acres @ $200.00/ac 1,812.00 <br />2. Resoiling, 12,181 yd' * 1.12 swell - 13580 @ $0.122/ yd' 1.660.49 <br />Net Total $7,096.49 <br />3. Indirect costs <br />Mobilization <br />Insurance, bond, and profit <br />4. Administration costs <br />741.13 <br />888.83 <br />709.65 <br />TOTAL ESTIMATE $9,436.12 <br />