My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124652
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:11 PM
Creation date
11/25/2007 12:50:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
9/24/2003
Doc Name
Adequacy Review
From
DMG
To
Elam Construction Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 05a <br />Date : 0923/2003 <br />User : SSS <br />State :Colorado <br />County :Mesa <br />Site : Gilsonite Pit <br />Agency or organization name : DMG <br />Permit or other job action :New 112c permit <br />Task description :Lower elevation of berms between <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $51.07 NA <br /> Operating cost/hour : $97.71 100 <br /> Ripper op.cost/hour : $2.40 25 <br /> Operator cost/hour : $31.83 NA <br /> Total unit cosUhour : $183.01 Total fleet cost/hour : .$183.01 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 15,480 BCY factor : 1.220 volume : 18,886 LCY <br /> <br />Source of estimated volume :1-2 berm (10k50k500), 1-3 berm (14k30k400) <br />Source of estimated swell factor :CAT handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill: 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method ; 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : -0.83 (lshi/t/day) <br />Compacted fill or embankment Spoii pile : 0.80 (ind-rQ <br /> Push gradient : 1.16 (Cat HB) <br />Average push gradient : 700 % (nag) Altitude : 1.00 (Cat N8) <br />Average site altitude : 4,455 feet Material weight : 0.82 (Cat HB) <br /> Blade type : 1.00 (S/SUN) <br />Material weight : 2,800 Ibs/LCY Net correction : 0.43 <br />Weight description <br />Clay -Natural bed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.203 /LCY <br />Pennitfjob# :M-2002-111 <br />Abbreviation :none <br />Filename : M111-05a <br />to 1'belowwaterleve! <br />Adjusted unit production : 901.15 LCY/hr <br />Adjusted fleet production : 901.15 LCY/hr <br /> <br />Total job time : 20.96 Hours <br />Total job cost: $3,835 <br />
The URL can be used to link to this page
Your browser does not support the video tag.