My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124652
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:11 PM
Creation date
11/25/2007 12:50:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
9/24/2003
Doc Name
Adequacy Review
From
DMG
To
Elam Construction Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 04a <br />Date : 09/222003 <br />User: SSS <br />Agency or organization name :OMG <br />Permit or otherjob action :New 112c permit <br />Task description : BacM!!! trench 1 and 2 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.07 NA <br />Operating cosUhour : $97.71 100 <br />Ripper op.cdsUhour: $0.00 0 <br />Operator cosUhour: $31.83 NA <br />Total unit cesUhour : $180.61 Total fleet cosUhour : $180.61 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 36,368 CCY factor : 1.135 volume : 41,278 LCY <br /> <br />Source of estimated volume : Exhibits L and G2 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Co rrection Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Sand and clay -Loose <br />State :Colorado <br />County :Mesa <br />Site :Gilsonite Pit <br />5.00 % (r <br />4,455 feet <br />2, 700 Ibs/LCY <br />JOB TIME ANb COST <br />Fleet size : 1 Dozer(sj <br />Unit cost : $0.164 /LCY <br />Operator skill : 0.75 (av <br />Material consistency : 1.10 (Cat <br />Dozing method : 1.00 (ge <br />Visibility: 1.00 (av <br />Job efficiency : 0.83 (lshifi <br />Spoil pile : 0.80 (fnd <br />Push gradient : 1.11 (Cat <br />Altitude : 1.00 (Cet <br />Material weight : 0.85 (Cat <br />Blade type : 1.00 (S/SI <br />Net correction : 0.52 <br />Adjusted unit production : 1098.11 LCY/hr <br />Adjusted fleet production : 1,098.11 LCY/hr <br />PermiUjob#:M-2002-111 <br />Abbreviation :none <br />Filename :M111-04a <br />Total job time : 37.59 Hours <br />Total job cost : $8,789 <br />
The URL can be used to link to this page
Your browser does not support the video tag.