Laserfiche WebLink
l j ~\ ~\ V <br />. ~ •` <br />Mr. `Bob F=eitag <br />Page -2- <br />other pits~not previously identified for topsoil salvage) such <br />topsoil will be saved (and stabilized) for reclamation purposes. <br />2. All final graded elopes will be no greater than 2:1 (h:v) (Rule <br />6.1), with the exception that elopes of the Ansley Flat Pit, <br />as stated in your plan, will be no steeper then 3:1. <br />3. The appropriate diversion and sediment catching structures, as <br />recommended by the Soil Conservation Service for the P,oberts <br />Tunnel, A. L. Hill and Valley of the Sun Pita will be constructed <br />before summer 1981. <br />4. If plans for a recreational area (ball parlc) for the Woodside Pit <br />are changed, the site will be reclaimed by grading, and revegetation <br />(as per Soil Conservation Service recommendations), unless an <br />alternate reclamation or land use plan ie developed, at which <br />time we are to be informed. Reclamation of this site is to be <br />carried to completion within 5 years (Rule 6) from the date of <br />this letter. <br />5. The Valley of the Sun Pit may require an Atmy Corps of Engineers <br />404 permit. I suggest you call the Resident Engineer in Littleton <br />for more information. r <br />Ne will be happy to consult with you when it ie time for reclamation of <br />these pits. <br />Sincerely, <br />Mika Stanton <br />Reclamation Specialist <br />PLS:ya <br />