Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agency or organization name : DMG <br /> <br />Task # : 005 State :Colorado Permit/job# : M-99.038 <br />Date : 09/fA99 County : La Plata Abhrenation :none <br />User : SSS Slte :Rowe Gravel Filename : M03B-005 <br /> <br />Permit or other job action :New Application <br /> <br />Task description :Replace topsoil over plt slopes and floor <br /> <br />HOURLY EQUIPMENT COST Basic machine : Cal D8N (1996) Horsepower : 285 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Lab Shih basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> <br /> Utilization Yo Cost data source : (CRG) <br />Cost Breakdown: Ownership cost/hour: 541.10 NA <br />Operating cosUhour: 455.64 100 <br />Ripper op cosUhour: 80.00 0 <br />Operator cosvhour: 523.12 NA <br />Total unit cosUhour : 8119.86 Total beet cosUhour : $119.86 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,387 LCY factor: NA volume: 1,387 LCV <br />Source of quantity lake-o6 :750'L x 30'W regraded slopes covered w/6-ol topsail <br /> <br />Source of est. swell factor : NA <br /> <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Average push distance: 55 feet Source <br />Unadjusted hourly production : 1126 LCYlhr <br />Material consistency description <br />Panlv consolidated srockoile <br />Average push gradient : 16.50 % (negJ <br />Average site altitude: 6,600 feet <br />Material weigh) : 2,100 Ibs/LCV <br />Material weight description . <br />Eanh-Loam <br />Operator skill 0.75 (av( <br />Material con5tslency: L10 (Cate <br />Dozing method : 1.20 (slc <br />Visibility: 1.00 (av( <br />Job efficiency: O.B3 (1shi1E <br />Spoil pile: d.BO (foil <br />Push gradient: 1.36 (Carl <br />Altitude : 1.00 (Cat l <br />Material weight: 1.10 (Carl <br />Blade type : 1.00 (S of <br />Nel correction : 0.98 <br />Adjusted unit poduction : 1101.39 LCV/hr <br />Adjusted Seel production: 1,101.39 LCV/hr <br />JOB TIME AND COST <br />Fleet site : 1 Dozers) <br />Unit cost : 50.109 /LCY <br />Total job lime : 1.26 Hours <br />Total joh cost : $151 <br />